Case Study - Industrial Production Unit 100dpi_4

Industrial Production Unit

Schwarzenberger + Endres

Lauchringen (Gerrmany)

 

All the buildings are described in a concept “Everything is under one roof“. Expandable steel skeleton for a low-tech industrial building. All static necessary components of the construction are calculated to the limit. Brief training of the building envelope, which encloses an administration unit of 600 m². Planning and construction period of 9 months.

Case Study - Industrial Production Unit 100dpi_3

Order volume: 3,5 Mio. Euro

within the outside areas and surounding Surface for utilisation: 4.500 m2

Volume: 33.750 m3

Full-service project

Several award-winnings