Industrial Production Unit
Schwarzenberger + Endres
Lauchringen (Gerrmany)
All the buildings are described in a concept “Everything is under one roof“. Expandable steel skeleton for a low-tech industrial building. All static necessary components of the construction are calculated to the limit. Brief training of the building envelope, which encloses an administration unit of 600 m². Planning and construction period of 9 months.
Order volume: 3,5 Mio. Euro
within the outside areas and surounding Surface for utilisation: 4.500 m2
Volume: 33.750 m3
Full-service project
Several award-winnings